As a result of modernization, over 10 years the capacity of RusHydro’s HPPs increased by 465 MW.
Replacement of power units at Rybinskaya HPP was completed.
RusHydro completes conversion of Anadyrskaya CHPP to natural gas
RusHydro has commissioned CHPP in Sovetskaya Gavan
RusHydro commissions Ust-Dzhegutinskaya small-scale hydropower plant
RusHydro commissions Barsuchkovskaya small hydropower plant
Verkhnebalkarskaya small-scale hydropower plant was commissioned
The Zaramagskaya HPP-1 was commissioned
RusHydro inaugurates state-of-the-art thermal power plant on Sakhalin Island
RusHydro brings online 320 MW Nizhne-Bureyskaya hydropower plant in the Russian Far East
Moody's upgraded RusHydro's credit rating to investment grade
RusHydro commissions third hydropower unit at Ust-Srednekanskaya HPP
RusHydro and UC RUSAL commission first stage of Boguchany aluminium smelter
RusHydro starts construction of two small hydropower plants on Kuban River
PJSC RusHydro announces that Fitch Ratings Ltd. raised PJSC RusHydro's long-term foreign currency issuer default rating to 'BBB-'. The rating agency affirmed the outlook at 'Stable'.
The first gas-fired boiler of Anadyrskaya TPP was launched
PJSC RusHydro, the Government of Sakha (Yakutia) Republic, PJSC Yakutskenergo, New Energy and Industrial Technology Development Organization of Japan (NEDO) and Takaoka Toko (Japan) have signed the document package to build a wind-diesel complex in Tiksi village
RusHydro ranked 91 in S&P Global Platts Top 250 Global Energy Company Ranking
The Annual General Meeting of Shareholders approved the highest dividends for the entire history – 19,9 billion roubles
RusHydro long-term rating raised to BB+ by S&P Global Ratings
Two solar power plants in Yakutia were commissioned
The second stage of the Blagoveshenskaya CHPP was completed
Zelenchukskaya HPP-PSHPP in the Karachay-Cherkess Republic was inaugurated
Zaragizhskaya Small HPP in Kabardino-Balkaria was commissioned
RAO ES of the East constructed the largest solar power plant in the Arctic Circle.
RusHydro modernised the generating equipment with a capacity of 1,212 MW
The first phase of the second stage of the Blagoveshenskaya CHPP was completed.
The Gotsatlinskaya HPP was commissioned.
The Annual General Meeting of Shareholders approved dividends - 6,03 billion roubles.
The Boguchanskaya HPP's reservoir was filled to its project level, the HPP reached its project level of electrical energy output.
The Russian Institute of Directors increased the corporate governance rating of RusHydro to level 8.
RusHydro entered into an agreement with a Chinese concern, PowerChina, on the joint construction of pumped storage plants
The Company signed an agreement with Three Groges, the Chinese company. The agreement is aimed at joining implementation of Russian Far East hydropower projects
One of the key outcomes of the Summit was the decision about the prospects for developing and the creating a new generation of energy systems
RusHydro organized the summit of the Global Sustainable Electricity Partnership (GSEP) in Moscow, which unites 14 of the world's largest energy companies
The Company has completed major restoration and reconstruction work at the Sayano-Shushenskaya HPP
The recently completed year draw a line under a major hydropower sector project – construction of the Boguchanskaya HPP with a total capacity of 2,997 MW
The Company chaired the Global Sustaiable Electricity Partnership during the period from June 2013 to May 2014
Modernization of 10 hydropower units of HPPs with overall capacity of 705 MW
The construction of the first stage of Ust-Srednekanskaya HPP in the Magadan Region was completed
Recapitalization of the Company in compliance with the Russian President's Decree No.1564
Update of approximately 500 MW of generating capacity
Implementation of electricity supply from the first hydro-power units of the Boguchanskaya HPP
Acquisitions of assets in Russia's Far East
Consolidation of existing hydro-power assets in Siberia
Completion of the Kashkhatau HPP and the Egorlykskaya HPP-2 construction
Completion of the first stage of restoration at the Sayano-Shushenskaya HPP
Depositary receipts (DRs) listed on the London Stock Exchange (LSE)
A depositary receipt (DR) program is launched
The Company's shares are listed on the Russian stock market
The Russian Federation becomes one of the Company’s shareholders via an additional share issue
Hydro-power generation assets of the re-organized OJSC RAO UES of Russia holding united
RusHydro was created under Russian Government Decree № 1254-r (dated 01.09.2003)